- Agua Del Sol - Tempe, AZ (2011) Tenant improvements in warehouse
-
Arizona Distilling Co. - Tempe, AZ (2012) Tenant improvement of 2,800 sf distillery
-
United Metal Products - Tempe, AZ (2013) Design for 26,000 sf tenant improvement
-
Foresight Finishing - Tempe, AZ (2010)Tenant improvement plans for industrial facility
-
Jet Products addition - Phoenix, AZ (2008)Expansion and remodeling of 7,000 sf facility
-
Pallet Connections - Phoenix, AZ (2009) Provide structural engineering to secure outdoor dust collection unit
-
Premier Building & Develop, BioMat USA - Phoenix, AZ (2004)
-
Longbow Construction - Gilbert, AZ (2004) Tenant improvement plans for 5,900 sf office/workshop
-
Hydrosystems - Tempe, AZ (2004)
-
Wrigley (Watkins): Mixer Room - Phoenix, AZ (2002) Construction documents for remodel of Mixer Room
-
Wrigley (Watkins): Code Review - Phoenix, AZ (2002) Conduct Building Code review
-
Wrigley (Watkins): Ingredient Weigh-up - Phoenix, AZ (2002) Construction documents for remodel of Ingredient Weigh Up Room
-
Wrigley (Watkins): 11 Pan #2 Mech Mezzanine - Phoenix, AZ (2002) Design for addition of interior mezzanine
-
Wrigley (University): Slicks Mechanical - Phoenix, AZ (2002) Design for addition of two rooftop mounted A/C units and two equipment platforms
-
Wrigley (University): Cutting Expansion - Phoenix, AZ (2002) Design for expansion of cutting rooms
-
Wrigley: base plans composite files - Phoenix, AZ (2002)
-
Wrigley: Phase I, Phase II, Flavor Room - Phoenix, AZ (2002)
-
American Rubber Inc. - Gila River Indian Community, AZ (2001)
-
Valley Steel - Peoria, AZ (2002) Documents for the installation of 14,000 sf pre-engineered manufactured metal building
-
Polytek Tire Shredding - Mesa, AZ (2000)